Backplane Requirements Checklist: What to Define Before You Request a Quote

RFQ Intake Checklist (Copy/Paste)

  • Mechanical
    • define: standard/architecture (OpenVPX, VME/VME64x, cPCI, custom) and slot map (payload, switch/control, PSU, RTM)
    • define: card size (3U/6U), slot spacing (0.8"/1.0"), total slots, reserved slots and depths
    • define: overall dimensions, thickness, mounting pattern, keep-outs
    • define: connectors per slot (series, positions), RTM usage, special I/O
    • define: guides, inject/eject, retention, EMI gaskets; shock/vibe limits
  • Electrical
    • define: power rails and max current per rail; connector type/location; hot-swap sequencing; protection/monitoring
    • define: fabrics/protocols (PCIe gen, Ethernet rate, Aurora/SRIO), lane counts per slot
    • define: clocks/timing (ref clocks, distribution, skew)
    • define: impedance targets, loss and crosstalk budgets, length-matching rules
    • define: stackup/materials, microstrip vs stripline, via/backdrill, terminations/AC coupling
  • Environmental
    • define: operating/storage temp, humidity/condensation, altitude/pressure
    • define: shock/vibration (e.g., MIL-STD-810), conformal coat
    • define: EMI/EMC goals (e.g., MIL-STD-461/DO-160), shielding/grounding strategy
    • define: safety certifications (UL/CSA) and ITAR/export controls
  • Documentation
    • define: required deliverables (schematic, layout, SI reports, drawings, BoM)
    • define: test/acceptance (ICT, functional, BIT connectors, fixtures), FAI, traceability/serialization
    • define: CM/change control, obsolescence plan, manufacturing location (Made in USA)
  • Timeline
    • define: design start/reviews, prototype need-by, LRIP/FRP ramp
    • define: quantities (proto/LRIP/FRP), budgetary vs firm quote, long-lead parts constraints
    • define: ECO process and cost/schedule impact handling

Getting an accurate quote starts with unambiguous requirements. Use the intake list above, then work through the sections below to de-risk scope and schedule.

Mechanical Requirements

  • define: standard/architecture and slot map (payload, switch/control, PSU, RTM)
  • define: card size (3U/6U), slot spacing (0.8"/1.0"), total slots, reserved positions/depths
  • define: overall L/W/T, mounting pattern, keep-outs for cabling/cooling
  • define: connector series per slot (DIN 41612, VITA 46/48, etc.), pin fields, RTM usage, special I/O/power connectors
  • define: guides, inject/eject hardware, retention/locking, EMI gaskets
  • define: shock/vibration limits and any chassis interface constraints

Electrical and Signal Integrity

  • define: power rails and max current per rail; connector types/locations; hot-swap sequencing; ORing/protection; power monitoring/telemetry
  • define: protocols and rates (PCIe gen, Ethernet speed, Aurora/SRIO), differential vs single‑ended, lane counts per slot
  • define: clocks/timing (reference clocks, distribution topology, skew/jitter limits)
  • define: impedance targets (e.g., 50Ω/100Ω), loss budget, crosstalk limits, propagation/skew
  • define: transmission strategy—microstrip vs stripline, stackup/materials, via/backdrill rules, termination/AC‑coupling caps
    image_2

Environmental and Compliance

  • define: operating/storage temperature range (e.g., -40°C to +85°C), humidity/condensation, altitude/pressure
  • define: shock/vibration limits and test methods (e.g., MIL‑STD‑810), conformal coating if required
  • define: EMI/EMC objectives (e.g., MIL‑STD‑461/DO‑160), shielding and grounding strategy
  • define: standards to meet (VITA 65/48, PICMG), safety certifications (UL/CSA), and ITAR/export controls
    image_3

Documentation and Manufacturing

  • define: required deliverables—schematic, PCB layout, SI reports, fab/assembly drawings, BoM
  • define: test artifacts—procedures, acceptance criteria, ICT/functional/BIT connectors, fixtures
  • define: production quantities (prototype, LRIP, FRP) and manufacturing location (Made in USA)
  • define: quality standards (ISO 9001, AS9100), FAI, serialization/traceability, CM/change control
    image_4

Timeline and Project Management

  • define: design start, review gates, and required design completion date
  • define: prototype delivery schedule and production ramp (LRIP/FRP)
  • define: critical milestones driving the schedule and any long‑lead risks
  • define: ECO/change process, cost/schedule impact evaluation, approval flow

Getting Your Quote Right the First Time

A concise, complete RFQ accelerates accurate pricing and realistic lead times while reducing design churn. Vector has long-standing experience supporting VME/VME64x, OpenVPX, and cPCI programs—Made in USA, ISO 9001 & AS9100 Certified, ITAR Registered.

Send your draft RFQ and we’ll point out missing items that typically delay quoting: https://vectorelect.com/contact